- Thread starter
- #1
My interior Rago interior panels came in over the weekend and did a little midweek project to install them as well as the Raptor and puddle lights
Rago tends to grossly underestimate their time estimates, said it'd take 30mins for this one. Took me about 1.5-2hrs (probably can be done faster, I'm tend to be more methodical and paranoid when drilling).
Construction and materials are solid but for every product I've gotten from them, the measurements tend to be off just enough to slow your project down to do a work around or be annoying. But overall happy w/ the product but probably wouldn't advise hanging anything heavy off of it
Rago tends to grossly underestimate their time estimates, said it'd take 30mins for this one. Took me about 1.5-2hrs (probably can be done faster, I'm tend to be more methodical and paranoid when drilling).
Construction and materials are solid but for every product I've gotten from them, the measurements tend to be off just enough to slow your project down to do a work around or be annoying. But overall happy w/ the product but probably wouldn't advise hanging anything heavy off of it
Sponsored